January Song: Day 8

In theory, today was “wrap day”. I’ve filmed enough stop motion footage to tell a train-based story, although not quite as much as I was planning to. With a bit of luck, what I’ve got should stretch to fit a 3 minute song.

The next couple of days will be digital work. Tomorrow will be signage, some touch-up work and trying to draw a better Darren face. Monday will be final tweaks and then a mad rush once I get a copy of the song. Darren reckons he’ll be able to get a rough cut to me by 1pm, which gives me about 6 hours to do the final edit and lip synching. And to film any extra footage that’s needed to pad things out.

Good times.